I'm beginning to think I'm better off not even having a kiln, but I hate to bug other people to batch anneal my beads. I'm in this fiasco with AIM and I still can't decide whether to go on and wait for my 84BD (with controller) or just get my money back and keep sending my beads out. I don't work at home. I work on my Dad's lot in a former feed shed. It's heavy steel, not that cheap aluminum, with a concrete floor, but there is a wood table and a wood cabinet in it. I was going to batch my beads in his garage because he has 20 amp circuits in there, but eventually I'd like to be able to put the beads directly from the flame into the kiln. But that would mean leaving it alone in the shed while it finishes the cycle. I'm not liking the whole scenario on that...
Cheryl
__________________
To view links or images in signatures your post count must be 5 or greater. You currently have 0 posts.
To view links or images in signatures your post count must be 5 or greater. You currently have 0 posts.
|